Capture system/subsystem condition, risk, and self-assessment inputs.
Editable hierarchy seeded from the KNK FPSO workbook, worksheet System List. Use this as the asset master basis before users submit condition self-assessments.
| Group # | Group Name | System # | System Name | Subsystem # | Subsystem Name |
|---|---|---|---|---|---|
Filtered results use anonymous submitter hashes and suppress detailed aggregates when n is below 3.
Only astor_admin can create, edit or delete self-assessment records; every mutation writes an AGA audit event.
| Assessment | System / Equipment | Availability | Condition | Risk | Priority | Lifecycle | Actions |
|---|---|---|---|---|---|---|---|
| sca-wip-a anon-wip-a-main-pump | Water Injection Water injection pump A | partial bad actor | abnormal vibration Performance degradation under high-load operation. | high C5 x L3 = 15 | #4 Routine - 4 weeks | draft draft only | |
| sca-gc-a anon-gc-a-seal-system | Gas Compression Gas compressor train A | yes bad actor | abnormal vibration Seal reliability degradation and delayed exception conversion. | high C4 x L4 = 16 | #3 Routine - 2 weeks | draft draft only | |
| sca-cooling anon-cooling-bearing | Utilities and Cooling Seawater lift and cooling train | yes not bad actor | normal vibration Thermal anomaly with abnormal lubrication condition. | high C4 x L3 = 12 | #4 Routine - 4 weeks | draft draft only |
| Workstream | Inputs | Outputs | Status |
|---|---|---|---|
| system hierarchy, subsystem hierarchy, equipment hierarchy, condition form, photos, risk rows | self-assessment records, bad actors, condition risks, priority actions | results | |
| astor_admin, engagement_lead, maintenance_engineer, reliability_engineer, operations_reviewer, integrity_reviewer | System condition JSON | role mapped | |
| anonymized_loss_shutdown_register_2017_2019.xlsx, anonymized_loss_shutdown_review_report.pdf, anonymized_rca_workshop_loss_shutdown_review.docx, anonymized_spares_impact_review.pptx, anonymized_site_survey_field_notes.docx, anonymized_system_condition_self_assessment.xlsx, anonymized_master_activity_register_template.xlsx, anonymized_master_activity_register_report.pdf, anonymized_thermography_summary.pdf, anonymized_vibration_oil_analysis_pack.pdf, anonymized_cmms_work_history_export.csv | rpt_aga-demo-fpso_executive | released |
Upload a source workbook or document to stage parser-mapped rows for review, or approve and apply them into editable AGA records when the source mapping is accepted.
No first-class RAM matrix version has been applied yet. Upload and approve the System Condition workbook to populate the Modec RAM basis and derived priority rules.
| Scope | System / Equipment | Condition | Grade | Evidence | Recommendation |
|---|---|---|---|---|---|
| site | - - | Field execution and preservation readiness Preservation and staging controls require tighter readiness tracking before recovery campaign execution. | medium | ev-site-survey | Add readiness evidence to 90/28/7 gate checklist. |
| system | sys-power - Power Generation - | Power-generation recurrent trip exposure Protection/control obsolescence and spares availability are linked to repeated production-impacting trips. | high | ev-loss-review, ev-spares-impact | Prioritize protection verification, spares reservation and trip recurrence review. |
| system | sys-gas - Gas Compression - | Gas-compression condition monitoring gap Vibration/oil-analysis exceptions require stronger conversion into CMMS execution scope. | high | ev-vibration, ev-cmms | Close PdM exception backlog and align seal/spares strategy. |
| equipment | sys-water-injection - Water Injection Water injection pump A | Water injection pump performance degradation Reduced reliability and performance shortfalls support recovery-campaign inclusion. | high | ev-system-condition | Scope pump performance restoration and reservoir-response sensitivity review. |
| equipment | sys-utilities - Utilities and Cooling Seawater lift and cooling train | Cooling train thermal anomaly Thermography indicates elevated temperature trend on critical cooling support equipment. | medium | ev-thermography | Inspect cooling train and confirm execution material requirements. |