Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Request, upload, register, and review evidence supporting interview statements.
| Stream | Source file | Target screen | Status | Seeded records |
|---|---|---|---|---|
| Questionnaire / maturity assessment baseline 19 topics, 325 questions, weights, evidence requirements, scoring scale and target maturity. | Maintenance Assessment Questionnaire.xlsx | Asset Baseline Setup | implemented binary parser | 325 |
| Evidence checklist Domain-level evidence checklist with requested artifact type, status and confidence basis. | MMA_Evidences.docx | Evidence Intake | implemented binary parser | 70 |
| Management assessment report reference Report structure, management findings, methodology language and annex expectations. | Maintenance Assessment Report.doc | Report Generator | implemented binary parser | 9 |
| System Condition Self-Assessment System list, equipment list, component list, assessment form and MODEC RAM matrix. | System Condition Self Assessment Form.xlsx | System Condition Self-Assessment | implemented binary parser | 18 |
| Workstream | Inputs | Outputs | Status |
|---|---|---|---|
| source manifests, extracted text, CMMS exports, shutdown logs, interview notes | evidence records, extraction warnings, finding signals | results | |
| astor_admin, engagement_lead, reliability_engineer, maintenance_engineer, operations_reviewer, integrity_reviewer | Evidence JSON | role mapped | |
| anonymized_loss_shutdown_register_2017_2019.xlsx, anonymized_loss_shutdown_review_report.pdf, anonymized_rca_workshop_loss_shutdown_review.docx, anonymized_spares_impact_review.pptx, anonymized_site_survey_field_notes.docx, anonymized_system_condition_self_assessment.xlsx, anonymized_master_activity_register_template.xlsx, anonymized_master_activity_register_report.pdf, anonymized_thermography_summary.pdf, anonymized_vibration_oil_analysis_pack.pdf, anonymized_cmms_work_history_export.csv | rpt_aga-demo-fpso_executive | released |
Import jobs create an auditable record for each source stream. Binary questionnaire, evidence checklist, and system-condition files can be applied through the owner/admin source file application workflow.
| Stream | Status | Records | Requested | Issues |
|---|---|---|---|---|
| Management assessment report reference Maintenance Assessment Report.doc | parser ready apply pending | 0/9 | 2026-07-01 | Binary parser ready for Maintenance Assessment Report.doc; controlled row-level application remains pending. |
Upload a source workbook or document to stage parser-mapped rows for review, or approve and apply them into editable AGA records when the source mapping is accepted.
Use this control for reports, pictures, spreadsheets, CMMS extracts, procedures, drawings, interview notes, site photos, or manually referenced artifacts. Uploaded files are stored through the configured evidence route; when blob storage is unavailable the record keeps a deterministic checksum reference.
Evidence requests stay separate from received artifact items. Links then connect accepted or reviewed evidence to topics, questions, inspections, findings, assets, systems, and report sections.
Filter artifacts by topic, review status, type, confidence and linked question before using them in normalized findings or adjusted score reviews. Respondent identities are not exposed here.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Assessment focal point / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Materials owner / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Materials owner / collected 2019-03-13
Seeded evidence link from the normalized MMA evidence checklist.
Convert questionnaire, evidence, visual inspection, system self-assessment, or loss-register inputs into a traceable finding. This does not overwrite raw interview scores; adjusted scores remain separate review records.
Checklist-driven evidence requests from the assessment source pack.
Evidence item records linked to requests or topics.
Reviewer accepted items eligible to support adjusted scores.
Accepted evidence over required evidence.
| Topic | Required | Received | Reviewed | Accepted | Missing | Weak | Coverage |
|---|---|---|---|---|---|---|---|
| Leadership and Strategy AGA-MD-02 | 3 | 1 | 1 | 1 | 2 | 0 | 33% |
| Maintenance Organization AGA-MD-03 | 6 | 4 | 1 | 1 | 2 | 1 | 17% |
| Reliability Availability and Maintainability AGA-MD-04 | 6 | 4 | 1 | 1 | 2 | 1 | 17% |
| Planning Scheduling and Execution AGA-MD-07 | 6 | 3 | 0 | 0 | 3 | 1 | 0% |
| Performance Indicators AGA-MD-08 | 4 | 2 | 1 | 1 | 2 | 0 | 25% |
| Computerized Maintenance Management System AGA-MD-09 | 6 | 4 | 1 | 1 | 2 | 1 | 17% |
| Preventive Maintenance AGA-MD-05 | 5 | 2 | 1 | 1 | 3 | 1 | 20% |
| Condition-Based Maintenance AGA-MD-06 | 4 | 2 | 1 | 1 | 2 | 1 | 25% |
| Maintenance Materials Management AGA-MD-10 | 7 | 2 | 1 | 1 | 5 | 0 | 14% |
| Technical Procedures AGA-MD-12 | 5 | 0 | 0 | 0 | 5 | 0 | 0% |
| Health Safety and Environment AGA-MD-18 | 5 | 0 | 0 | 0 | 5 | 0 | 0% |
| Financial Optimization AGA-MD-14 | 5 | 0 | 0 | 0 | 5 | 0 | 0% |
| Human Resources AGA-MD-16 | 8 | 0 | 0 | 0 | 8 | 0 | 0% |
| Request | Topic | Owner | Requested from | Due | Status |
|---|---|---|---|---|---|
| Latest maintenance organization chart evreq-evidence-check-aga-md-02-01 | AGA-MD-02 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | accepted |
| Defined maintenance goals and indicators for company, customer and people objectives evreq-evidence-check-aga-md-02-02 | AGA-MD-02 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Example of maintenance and reliability improvement plan and achieved results evreq-evidence-check-aga-md-02-03 | AGA-MD-02 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Maintenance productivity figures evreq-evidence-check-aga-md-03-01 | AGA-MD-03 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | received |
| Maintenance job descriptions evreq-evidence-check-aga-md-03-02 | AGA-MD-03 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Maintenance competence map evreq-evidence-check-aga-md-03-03 | AGA-MD-03 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | under review |
| Maintenance training and development map evreq-evidence-check-aga-md-03-04 | AGA-MD-03 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | received |
| Organization change control procedure and temporary replacement record |
| Artifact | Type | Confidence | Review |
|---|---|---|---|
| Latest maintenance organization chart sha256://anonymized-evidence/evreq-evidence-check-aga-md-02-01 | document | strong | accepted |
| Maintenance productivity figures sha256://anonymized-evidence/evreq-evidence-check-aga-md-03-01 | document | moderate | under review |
| Maintenance competence map sha256://anonymized-evidence/evreq-evidence-check-aga-md-03-03 | document | moderate | under review |
| Maintenance training and development map sha256://anonymized-evidence/evreq-evidence-check-aga-md-03-04 | document | weak | under review |
| Organization change control procedure and temporary replacement record sha256://anonymized-evidence/evreq-evidence-check-aga-md-03-05 | procedure | strong | accepted |
| List of safety critical equipment sha256://anonymized-evidence/evreq-evidence-check-aga-md-04-01 | document | moderate | under review |
| Criticality definition criteria sha256://anonymized-evidence/evreq-evidence-check-aga-md-04-02 | document | weak | under review |
| RCM/FMEA database examples sha256://anonymized-evidence/evreq-evidence-check-aga-md-04-04 | document | moderate | under review |
| Work order report with repair time, spare parts and failure statistics sha256://anonymized-evidence/evreq-evidence-check-aga-md-04-06 | report | strong | accepted |
| 7 DLA scheduling and compliance evidence |
Run CMMS readiness recovery before baseline freeze and score release.
Create a materials recovery workstream linked to QA, inventory accuracy and critical spares.
Define CBM ownership, schedule, trigger thresholds and KPI reporting.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Anonymized West Africa FPSO historical loss, trip, shutdown and spares-impact register.
Structured maturity questionnaire, respondent matrix, score weights and Top 3 voting.
Evidence request taxonomy by AGA/MMA topic.
Inspection, document review, system review and normalization observations.
System/equipment/component condition form with vulnerabilities, KPIs, photos and signoffs.
| AGA-MD-03 |
| AGA evidence coordinator |
| Assessment focal point |
| 2019-03-08 |
| accepted |
| Maintenance age pyramid evreq-evidence-check-aga-md-03-06 | AGA-MD-03 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| List of safety critical equipment evreq-evidence-check-aga-md-04-01 | AGA-MD-04 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | received |
| Criticality definition criteria evreq-evidence-check-aga-md-04-02 | AGA-MD-04 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | under review |
| RCA database examples evreq-evidence-check-aga-md-04-03 | AGA-MD-04 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| RCM/FMEA database examples evreq-evidence-check-aga-md-04-04 | AGA-MD-04 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | received |
| Life-cycle-cost analysis examples evreq-evidence-check-aga-md-04-05 | AGA-MD-04 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Work order report with repair time, spare parts and failure statistics evreq-evidence-check-aga-md-04-06 | AGA-MD-04 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | accepted |
| 7 DLA scheduling and compliance evidence evreq-evidence-check-aga-md-07-01 | AGA-MD-07 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | under review |
| 28 DLA scheduling and compliance evidence evreq-evidence-check-aga-md-07-02 | AGA-MD-07 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Work order flow and status example evreq-evidence-check-aga-md-07-03 | AGA-MD-07 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Planning, scheduling and execution indicators evreq-evidence-check-aga-md-07-04 | AGA-MD-07 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | received |
| Backlog calculation methodology and CM/PM/project/unplanned classification evreq-evidence-check-aga-md-07-05 | AGA-MD-07 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Work order close-out information including cost, man-hours, materials and services evreq-evidence-check-aga-md-07-06 | AGA-MD-07 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | under review |
| Maintenance indicators evreq-evidence-check-aga-md-08-01 | AGA-MD-08 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | accepted |
| MTBF and technical availability by equipment or overall evreq-evidence-check-aga-md-08-02 | AGA-MD-08 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| Maintenance productivity indicators evreq-evidence-check-aga-md-08-03 | AGA-MD-08 | AGA evidence coordinator | Assessment focal point | 2019-03-08 | requested |
| document |
| weak |
| under review |
| Planning, scheduling and execution indicators sha256://anonymized-evidence/evreq-evidence-check-aga-md-07-04 | document | moderate | under review |
| Work order close-out information including cost, man-hours, materials and services sha256://anonymized-evidence/evreq-evidence-check-aga-md-07-06 | document | moderate | under review |
| Maintenance indicators sha256://anonymized-evidence/evreq-evidence-check-aga-md-08-01 | document | strong | accepted |
| Indicator calculation procedure with source, frequency and owner sha256://anonymized-evidence/evreq-evidence-check-aga-md-08-04 | procedure | moderate | under review |
| Planning, scheduling and equipment technical information in CMMS sha256://anonymized-evidence/evreq-evidence-check-aga-md-09-01 | cmms extract | moderate | under review |
| Regulatory, class, flag, insurance and governmental certificates controlled by CMMS sha256://anonymized-evidence/evreq-evidence-check-aga-md-09-03 | cmms extract | weak | under review |
| Work order status-code definition procedure sha256://anonymized-evidence/evreq-evidence-check-aga-md-09-04 | procedure | strong | accepted |
| CMMS training-control evidence sha256://anonymized-evidence/evreq-evidence-check-aga-md-09-06 | cmms extract | moderate | under review |
| PM versus CM report for last 12 months sha256://anonymized-evidence/evreq-evidence-check-aga-md-05-03 | report | weak | under review |
| Substation maintenance program sha256://anonymized-evidence/evreq-evidence-check-aga-md-05-05 | document | strong | accepted |
| Vibration, thermography and transformer oil reports sha256://anonymized-evidence/evreq-evidence-check-aga-md-06-01 | report | strong | accepted |
| Reliability project evaluation reports and indicators sha256://anonymized-evidence/evreq-evidence-check-aga-md-06-04 | report | weak | under review |
| Material management indicators report sha256://anonymized-evidence/evreq-evidence-check-aga-md-10-01 | report | moderate | under review |
| Last inventory audit and control report sha256://anonymized-evidence/evreq-evidence-check-aga-md-10-03 | report | strong | accepted |
| Evidence | Topic | Report section |
|---|---|---|
| evitem-001 | AGA-MD-02 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-002 | AGA-MD-03 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-003 | AGA-MD-03 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-004 | AGA-MD-03 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-005 | AGA-MD-03 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-006 | AGA-MD-04 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-007 | AGA-MD-04 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-008 | AGA-MD-04 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-009 | AGA-MD-04 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-010 | AGA-MD-07 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-011 | AGA-MD-07 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-012 | AGA-MD-07 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-013 | AGA-MD-08 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-014 | AGA-MD-08 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-015 | AGA-MD-09 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-016 | AGA-MD-09 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-017 | AGA-MD-09 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-018 | AGA-MD-09 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-019 | AGA-MD-05 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-020 | AGA-MD-05 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-021 | AGA-MD-06 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-022 | AGA-MD-06 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-023 | AGA-MD-10 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
| evitem-024 | AGA-MD-10 | Results and Analysis by Topic Seeded evidence link from the normalized MMA evidence checklist. |
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Review stakeholder comments, evidence coverage, and site verification before release.
Request stronger source artifacts or lower the adjusted interpretation until evidence improves.
Request stronger source artifacts or lower the adjusted interpretation until evidence improves.
Request stronger source artifacts or lower the adjusted interpretation until evidence improves.
Request stronger source artifacts or lower the adjusted interpretation until evidence improves.
Request stronger source artifacts or lower the adjusted interpretation until evidence improves.
Request stronger source artifacts or lower the adjusted interpretation until evidence improves.
Link photos/evidence, confirm scope, and reflect the finding in recovery actions.
Link photos/evidence, confirm scope, and reflect the finding in recovery actions.
Link photos/evidence, confirm scope, and reflect the finding in recovery actions.
Link photos/evidence, confirm scope, and reflect the finding in recovery actions.
Link photos/evidence, confirm scope, and reflect the finding in recovery actions.
Link photos/evidence, confirm scope, and reflect the finding in recovery actions.
Review risk rows, open actions, evidence references, and include confirmed scope in the roadmap.
Review risk rows, open actions, evidence references, and include confirmed scope in the roadmap.
Review risk rows, open actions, evidence references, and include confirmed scope in the roadmap.